HOME   NEWS   SEARCH   SITEMAP   TIMELINE   IMAGES   HELP   VIDEOS   TOUR   STORE   CONTACT

Forward Shell Room

 

Go up

Go up 2 levals via hand-winch
to "outside the Forward turret"

Go up

 
Go aft




Go forward

Go aft
to the
Boiler Room

Go forward to the cell

Go aft

Go forward

         

Hold Deck

Stern view of Propellers Boiler room Engine room Forward Shell room Boiler Room & Engine Room Cell Snider Magazine Capstan Engine Q.-F. Gun Magazine.

The forward shell room, holding 194 projectiles, mouseover on main image was built as an iron tank which could be flooded if necessary. Shells were stored on wooden racks and transported to the hatch by means of an overhead rail mouseover on main image fitted with a travelling purchase. The shells were then raised up to the Shield Deck by means of a hand winch fitted with a chain purchase. The first shells transported to the Shield Deck were from the "ready" rack, immediately under the hatch; they were stored heads up, with slings on ready for hoisting. mouseover on main image Mouseover two men as well. mouseover on main image

Drawing: from The Three Headed Dog,
by Bob Nicholls.